Equipment Included:
- Pilot FC or IH controller
- Hunter #2 Phillips screwdriver
- Pedestal mounting template with hardware
- Pilot FC or IH Manual
- Keys
Additional Tools & Supplies Required:
- 7/16” (11mm), 9/16” (14 mm), and 11/32” (9mm) sockets and wrench.
- Wire Stripper and wire nuts
- Hammer and nails to assemble concrete form
- Form material
- Level
- 4” (10 cm) conduit sweep for station wires
- 1” (2.5 cm) conduit sweep for incoming AC power cable
- 1” (2.5 cm) conduit sweep for outgoing AC power cable (if needed)
- 1” (2.5 cm) conduit sweep for GCBL communication cable (if needed)
- 1.5” (4 cm) conduit sweep for earth ground wire.
- Concrete tools (trowels, shovels, wheelbarrow)
- Concrete materials (concrete mix and water)
Ti serve ancora aiuto? Siamo qui per te.
Dicci di cosa hai bisogno e troveremo la soluzione migliore per te.